Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
- JosiahSpurr
- Topix Regular
- Posts: 166
- Joined: Mon Jul 26, 2010 4:39 pm
- Experience: Level 4 Explorer
- Location: Topanga, CA
- Contact:
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
Great, thanks. Note that the PROJECT UPDATE above (Jan. 26) does not include the boulder slide (4 of 5) and the larger mudslide (5 of 5) mentioned in my May 25 post above.
- commonloon
- Topix Regular
- Posts: 352
- Joined: Wed Aug 07, 2013 3:32 pm
- Experience: Level 4 Explorer
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
SEKI posted to their facebook page (just noticed):
"Highway 180 to Cedar Grove and Roads End: Highway 180 was severely damaged and closed throughout all of 2023. Caltrans is continuing repairs outside the park, west of Cedar Grove. Current projections are for repairs to be completed sometime in June. We hope to reopen Cedar Grove to the public shortly after Caltrans repairs are complete."
This sounds hopeful for a July opening of Cedar Grove, etc.
"Highway 180 to Cedar Grove and Roads End: Highway 180 was severely damaged and closed throughout all of 2023. Caltrans is continuing repairs outside the park, west of Cedar Grove. Current projections are for repairs to be completed sometime in June. We hope to reopen Cedar Grove to the public shortly after Caltrans repairs are complete."
This sounds hopeful for a July opening of Cedar Grove, etc.
- mkbgdns
- Topix Regular
- Posts: 129
- Joined: Thu Aug 06, 2009 11:43 am
- Experience: N/A
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
your hopefulness should include a plan B.
- maverick
- Forums Moderator
- Posts: 12085
- Joined: Thu Apr 06, 2006 5:54 pm
- Experience: Level 4 Explorer
Reds Meadow Road Construction Update
SEKI NP:
Tentatively beginning April 15 through about May 10 significant weekday, daytime closures will go into effect between Hospital Rock and the Giant Forest Museum. See image for the detailed schedule during this period. During the second 4-week phase, tentatively scheduled from May 13 to June 7, weekday, daytime delays should only be about 30 minutes.
Access from Grant Grove in Kings Canyon to the Giant Forest area in Sequoia will be open to visit the General Sherman Tree, Lodgepole, Moro Rock, and more when closures are in effect.
Similar road construction will be taking place along the Mineral King Road, but a start date or schedule have not been set. Current estimate is for work to begin in late April and take about 8 weeks to complete. Road closures with scheduled pass throughs for residents will be in effect until the Memorial Day weekend, when access typically reopens for the season to public vehicles. After the Memorial Day weekend, delays should only be about 30 minutes through project completion.
Road construction by Caltrans outside the park on Highway 180 to Cedar Grove is still projected to be completed sometime in June. We hope to reopen Cedar Grove to the public shortly after Caltrans repairs are complete.
Crystal Cave Road will remain closed for repairs and recovery in 2024.
Schedules are subject to change, and we urge anyone planning to visit during this time to check our park website for the most current information: https://www.nps.gov/seki/planyourvisit/ ... uction.htm
Tentatively beginning April 15 through about May 10 significant weekday, daytime closures will go into effect between Hospital Rock and the Giant Forest Museum. See image for the detailed schedule during this period. During the second 4-week phase, tentatively scheduled from May 13 to June 7, weekday, daytime delays should only be about 30 minutes.
Access from Grant Grove in Kings Canyon to the Giant Forest area in Sequoia will be open to visit the General Sherman Tree, Lodgepole, Moro Rock, and more when closures are in effect.
Similar road construction will be taking place along the Mineral King Road, but a start date or schedule have not been set. Current estimate is for work to begin in late April and take about 8 weeks to complete. Road closures with scheduled pass throughs for residents will be in effect until the Memorial Day weekend, when access typically reopens for the season to public vehicles. After the Memorial Day weekend, delays should only be about 30 minutes through project completion.
Road construction by Caltrans outside the park on Highway 180 to Cedar Grove is still projected to be completed sometime in June. We hope to reopen Cedar Grove to the public shortly after Caltrans repairs are complete.
Crystal Cave Road will remain closed for repairs and recovery in 2024.
Schedules are subject to change, and we urge anyone planning to visit during this time to check our park website for the most current information: https://www.nps.gov/seki/planyourvisit/ ... uction.htm
Professional Sierra Landscape Photographer
I don't give out specific route information, my belief is that it takes away from the whole adventure spirit of a trip, if you need every inch planned out, you'll have to get that from someone else.
Have a safer backcountry experience by using the HST ReConn Form 2.0, named after Larry Conn, a HST member: http://reconn.org
I don't give out specific route information, my belief is that it takes away from the whole adventure spirit of a trip, if you need every inch planned out, you'll have to get that from someone else.
Have a safer backcountry experience by using the HST ReConn Form 2.0, named after Larry Conn, a HST member: http://reconn.org
- Wandering Daisy
- Topix Docent
- Posts: 7051
- Joined: Sun Jan 24, 2010 8:19 pm
- Experience: N/A
- Location: Fair Oaks CA (Sacramento area)
- Contact:
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
I just checked on reserve.gov and no permits are available from Roads End yet, regardless of date. I wonder if the road does open, are the first weeks permits going to all be put in "walk-in"? I suspect if it does open, there will be a rush and permits will be hard to get. Nothing was mentioned about the campgrounds. Can we assume that all campgrounds would open when the road opens?
- Lenier
- Topix Regular
- Posts: 182
- Joined: Fri Jun 21, 2019 10:02 pm
- Experience: Level 3 Backpacker
- Location: Visalia
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
I would not assume the campgrounds will open at all this year, based off what I've heard from someone who operates a business in the canyon. It could happen, but it certainly won't be right when the road opens.
- jmherrell
- Topix Acquainted
- Posts: 81
- Joined: Sun Jun 10, 2012 2:41 pm
- Experience: N/A
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
Caltrans District 6 (Fresno) just announced on Facebook that 180 will be opened to the park boundary tomorrow (5/10). The park has said nothing yet about a reopening date.
- jmherrell
- Topix Acquainted
- Posts: 81
- Joined: Sun Jun 10, 2012 2:41 pm
- Experience: N/A
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
Caltrans Road Information 180 status just changed to Open
BTW 180 ends at the park boundary
BTW 180 ends at the park boundary
- grampy
- Topix Expert
- Posts: 454
- Joined: Tue May 15, 2018 10:45 am
- Experience: Level 3 Backpacker
- Location: Redondo Beach
- jmherrell
- Topix Acquainted
- Posts: 81
- Joined: Sun Jun 10, 2012 2:41 pm
- Experience: N/A
Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023
When I look at Caltrans for 180 I get
"No traffic restrictions are reported for this area."
It changed soon after 12:00.
"No traffic restrictions are reported for this area."
It changed soon after 12:00.