ATTN DRIVERS: Our snow plows have reached the eastern gate of Yosemite National Park on State Route 120 W. But before we can reopen the highway, our crews have to remove rocks that fell onto the road, repair pavement and guardrail damage caused by those rocks, and repair rock berms.
Basically, a lot of rock stuff has to be handled before the highway can safely reopen.
SR 120 Plowed To Eastern Gate (From The East)
- maverick
- Forums Moderator
- Posts: 12085
- Joined: Thu Apr 06, 2006 5:54 pm
- Experience: Level 4 Explorer
SR 120 Plowed To Eastern Gate (From The East)
Inyo NF:
Professional Sierra Landscape Photographer
I don't give out specific route information, my belief is that it takes away from the whole adventure spirit of a trip, if you need every inch planned out, you'll have to get that from someone else.
Have a safer backcountry experience by using the HST ReConn Form 2.0, named after Larry Conn, a HST member: http://reconn.org
I don't give out specific route information, my belief is that it takes away from the whole adventure spirit of a trip, if you need every inch planned out, you'll have to get that from someone else.
Have a safer backcountry experience by using the HST ReConn Form 2.0, named after Larry Conn, a HST member: http://reconn.org
- austex
- Topix Expert
- Posts: 557
- Joined: Mon May 21, 2012 11:51 am
- Experience: N/A
- Location: Austin, Texas
Re: SR 120 Plowed To Eastern Gate (From The East)
Sounds like Mark's "when will Tioga open lottery" RIP
Who is online
Users browsing this forum: No registered users and 1 guest