Tioga Pass opening date
- rlown
- Topix Docent
- Posts: 8224
- Joined: Thu Oct 25, 2007 5:00 pm
- Experience: Level 4 Explorer
- Location: Wilton, CA
Re: Tioga Pass opening date
So, that first pic was of CalTrans trying to clear to the gate on the East? very cool.
Where was that second pic?
Russ
Where was that second pic?
Russ
- maverick
- Forums Moderator
- Posts: 12087
- Joined: Thu Apr 06, 2006 5:54 pm
- Experience: Level 4 Explorer
Re: Tioga Pass opening date
Rlown wrote "Where was that second pic?". Maybe Tioga Pass Resort.
Professional Sierra Landscape Photographer
I don't give out specific route information, my belief is that it takes away from the whole adventure spirit of a trip, if you need every inch planned out, you'll have to get that from someone else.
Have a safer backcountry experience by using the HST ReConn Form 2.0, named after Larry Conn, a HST member: http://reconn.org
I don't give out specific route information, my belief is that it takes away from the whole adventure spirit of a trip, if you need every inch planned out, you'll have to get that from someone else.
Have a safer backcountry experience by using the HST ReConn Form 2.0, named after Larry Conn, a HST member: http://reconn.org
- rlown
- Topix Docent
- Posts: 8224
- Joined: Thu Oct 25, 2007 5:00 pm
- Experience: Level 4 Explorer
- Location: Wilton, CA
Re: Tioga Pass opening date
well, yeah, if i open the pic. doh!
She's deep. sweet.
She's deep. sweet.
- rlown
- Topix Docent
- Posts: 8224
- Joined: Thu Oct 25, 2007 5:00 pm
- Experience: Level 4 Explorer
- Location: Wilton, CA
Re: Tioga Pass opening date
Last Update: May 9, 2011
Tioga Road: Rotary plows have reached the Siesta Lake area just past the 8,000 foot elevation mark. Snow depths average 10 feet in depth. Charcoal has been spread over Olmsted Point to aid the melting of the snow above the road. Crews will work Monday through Saturday.
Glacier Point Road: Dozers have plowed off enough snow that the rotary blowers are to Washburn Point. Work will continue Monday through Thursday working down through the switchbacks to the parking lot. Average snow depth is still eight feet.
Mariposa Grove: The road is open; all weight restrictions have been removed.
Tioga Road: Rotary plows have reached the Siesta Lake area just past the 8,000 foot elevation mark. Snow depths average 10 feet in depth. Charcoal has been spread over Olmsted Point to aid the melting of the snow above the road. Crews will work Monday through Saturday.
Glacier Point Road: Dozers have plowed off enough snow that the rotary blowers are to Washburn Point. Work will continue Monday through Thursday working down through the switchbacks to the parking lot. Average snow depth is still eight feet.
Mariposa Grove: The road is open; all weight restrictions have been removed.
-
- Topix Fanatic
- Posts: 1328
- Joined: Thu Dec 24, 2009 11:16 am
- Experience: Level 4 Explorer
Re: Tioga Pass opening date
June 30.
Do you really think Mark would buy ME a drink?
Do you really think Mark would buy ME a drink?
- rlown
- Topix Docent
- Posts: 8224
- Joined: Thu Oct 25, 2007 5:00 pm
- Experience: Level 4 Explorer
- Location: Wilton, CA
Re: Tioga Pass opening date
If you backpack with mark, he will buy you a drink.
- Wandering Daisy
- Topix Docent
- Posts: 7051
- Joined: Sun Jan 24, 2010 8:19 pm
- Experience: N/A
- Location: Fair Oaks CA (Sacramento area)
- Contact:
Re: Tioga Pass opening date
What is the definition of "open" for Tioga Pass? I recall plowing is done and it is open several days for park personnel use before they let the general public. My guess is June 15 for first general public car access.
- paula53
- Topix Regular
- Posts: 141
- Joined: Tue May 01, 2007 2:31 pm
- Experience: N/A
- Location: carson city nv
Re: Tioga Pass opening date
I am thinking July 4th. Terrible snow year.
- rlown
- Topix Docent
- Posts: 8224
- Joined: Thu Oct 25, 2007 5:00 pm
- Experience: Level 4 Explorer
- Location: Wilton, CA
Re: Tioga Pass opening date
Last Update: May 16, 2011
Tioga Road: Yesterday, crews started at Yosemite Creek and ended at an avalanche zone, plowing 1.6 miles. Crews will attempt to go through the avalanche zone today, conditions permitting.
Glacier Point Road: No update (since the last update previously posted)
url: http://www.nps.gov/yose/planyourvisit/tioga.htm" onclick="window.open(this.href);return false;
Tioga Road: Yesterday, crews started at Yosemite Creek and ended at an avalanche zone, plowing 1.6 miles. Crews will attempt to go through the avalanche zone today, conditions permitting.
Glacier Point Road: No update (since the last update previously posted)
url: http://www.nps.gov/yose/planyourvisit/tioga.htm" onclick="window.open(this.href);return false;
- rlown
- Topix Docent
- Posts: 8224
- Joined: Thu Oct 25, 2007 5:00 pm
- Experience: Level 4 Explorer
- Location: Wilton, CA
Re: Tioga Pass opening date
Last Update: May 19, 2011
Tioga Road: Yesterday, crews plowed the Big Oak Flat Road due to new snowfall, plowed 18-20 inches of new snow on the Tioga Road, then plowed 0.4 miles from previous point (now at Porcupine Summit). Snow depth is 11 feet.
Additionally, Mono County Public Works and Mammoth Mountain crews have begun plowing from the east side and are now at Mono/Parker Pass Trailhead.
Tioga Road: Yesterday, crews plowed the Big Oak Flat Road due to new snowfall, plowed 18-20 inches of new snow on the Tioga Road, then plowed 0.4 miles from previous point (now at Porcupine Summit). Snow depth is 11 feet.
Additionally, Mono County Public Works and Mammoth Mountain crews have begun plowing from the east side and are now at Mono/Parker Pass Trailhead.
Who is online
Users browsing this forum: No registered users and 14 guests